LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

Description

LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

-Type: Universal Lead Acid Battery Charger
-Output Voltage: 6V and 12V (manual switch between the two)
-Output Voltage Type: DC
-Output Current: 4A
-Input Voltage: 220V
-Input Voltage Type: AC
-Analog Display: Shows output voltage and a basic charging current meter (0–6A range)
-Voltage Selector Switch: Toggle switch to select 6V or 12V
-Fuse Protected: 1A
-4 LED Indicators: Display charging current level
-Battery Charger Cable with Spade Terminals and Alligator Clips Red/Black
-Dimensions: 18.5x12x10.5 cm / 120 cm (cable Length)
-Color:
Black
-Brand:
LIanlong
-Made In:
China
-Model:
LLD12400CT
-Ref:
LIanlong-LLD12400CT-219669
-Unit:
Pcs

Product form

SKU: 9461

Product Information

  • 6V and 12V (manual switch), DC, 4A , 220V AC input, Analog display (0–6A range), Voltage selector switch (6V/12V), 1A fuse protected, 4 LED indicators, 18.5x12x10.5 cm , Black
  • Brand: LIanlong
  • Model: LLD12400CT
  • Made in: China
  • Ref: LIanlong-LLD12400CT-219669
  • Unit: Pcs
Currently delivering in Lebanon only.Currently delivering in Lebanon only.

Delivery is available across Lebanon only. Same-day delivery in Beirut and its suburbs, while other areas are delivered within 2–4 working days. International shipping is currently unavailable.

Free pickup in our shop(s)

Fast Pickup & Delivery  Same-day delivery in Beirut & suburbs
2–4 working days across Lebanon

  • Shipped today? Order within: Nov 17, 2026 23:59:00 +0200

Description

LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

-Type: Universal Lead Acid Battery Charger
-Output Voltage: 6V and 12V (manual switch between the two)
-Output Voltage Type: DC
-Output Current: 4A
-Input Voltage: 220V
-Input Voltage Type: AC
-Analog Display: Shows output voltage and a basic charging current meter (0–6A range)
-Voltage Selector Switch: Toggle switch to select 6V or 12V
-Fuse Protected: 1A
-4 LED Indicators: Display charging current level
-Battery Charger Cable with Spade Terminals and Alligator Clips Red/Black
-Dimensions: 18.5x12x10.5 cm / 120 cm (cable Length)
-Color:
Black
-Brand:
LIanlong
-Made In:
China
-Model:
LLD12400CT
-Ref:
LIanlong-LLD12400CT-219669
-Unit:
Pcs

Reviews

LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

0 out of 5 stars

This product has no reviews yet

Recently viewed products

    © 2026 Mohamad Osman Electric | MOE, Powered by Shopify