LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

Description

LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

-Type: Universal Lead Acid Battery Charger
-Output Voltage: 6V and 12V (manual switch between the two)
-Output Voltage Type: DC
-Output Current: 4A
-Input Voltage: 220V
-Input Voltage Type: AC
-Analog Display: Shows output voltage and a basic charging current meter (0–6A range)
-Voltage Selector Switch: Toggle switch to select 6V or 12V
-Fuse Protected: 1A
-4 LED Indicators: Display charging current level
-Battery Charger Cable with Spade Terminals and Alligator Clips Red/Black
-Dimensions: 18.5x12x10.5 cm / 120 cm (cable Length)
-Color:
Black
-Brand:
LIanlong
-Made In:
China
-Model:
LLD12400CT
-Ref:
LIanlong-LLD12400CT-219669
-Unit:
Pcs

Product form

SKU: 9461

Product Information

  • 6V and 12V (manual switch), DC, 4A , 220V AC input, Analog display (0–6A range), Voltage selector switch (6V/12V), 1A fuse protected, 4 LED indicators, 18.5x12x10.5 cm , Black
  • Brand: LIanlong
  • Model: LLD12400CT
  • Made in: China
  • Ref: LIanlong-LLD12400CT-219669
  • Unit: Pcs
    • Shipped today? Order within: Oct 05, 2025 23:59:00 +0300

    Description

    LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

    -Type: Universal Lead Acid Battery Charger
    -Output Voltage: 6V and 12V (manual switch between the two)
    -Output Voltage Type: DC
    -Output Current: 4A
    -Input Voltage: 220V
    -Input Voltage Type: AC
    -Analog Display: Shows output voltage and a basic charging current meter (0–6A range)
    -Voltage Selector Switch: Toggle switch to select 6V or 12V
    -Fuse Protected: 1A
    -4 LED Indicators: Display charging current level
    -Battery Charger Cable with Spade Terminals and Alligator Clips Red/Black
    -Dimensions: 18.5x12x10.5 cm / 120 cm (cable Length)
    -Color:
    Black
    -Brand:
    LIanlong
    -Made In:
    China
    -Model:
    LLD12400CT
    -Ref:
    LIanlong-LLD12400CT-219669
    -Unit:
    Pcs

    Reviews

    LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

    LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT

    0 out of 5 stars

    This product has no reviews yet

    Recently viewed products

    © 2025 MOElectric,

        Login

        Forgot your password?

        Don't have an account yet?
        Create account