LIanlong Universal Lead Acid Automatic Battery Charger 6V & 12V 4A | LLD12400CT
- بائعLIanlong
رمز التخزين التعريفي: 9461
معلومات المنتج
6V and 12V (manual switch), DC, 4A , 220V AC input, Analog display (0–6A range), Voltage selector switch (6V/12V), 1A fuse protected, 4 LED indicators, 18.5x12x10.5 cm , Black
Brand: LIanlong
Model: LLD12400CT
Made in: China
Ref: LIanlong-LLD12400CT-219669
Unit: Pcs
بطاقة تعريف
Delivery is available across Lebanon only. Same-day delivery in Beirut and its suburbs, while other areas are delivered within 2–4 working days. International shipping is currently unavailable.
